Section 20 - Landscaping
07/24/01
20.17
scope of work, shall be paid for as extra work as provided in Section 9, “Changes and Claims”,
of these Specifications.
20-5.06 Measurement and Payment
Except as otherwise provided in these Specifications or the Special Provisions, full
compensation for conforming to the requirements in this Section (Section 20) is included in the
prices paid for the various items of work and no additional compensation will be paid.
20-6 RECORD DRAWINGS AND CONTROLLER CHARTS
The Contractor shall maintain record drawings and controller drawings in conformance with
the requirements in Section 11, “Preconstruction Photographs and Record Drawings”, of these
Specifications and this Section (Section 20).
Prior to the final inspection, the Contractor shall submit to the Agency, for review and
comment by the Landscape Architect, one (1) set of Record Drawings. The work will not be
formally accepted until the Record Drawings are accepted by the Landscape Architect. Upon
approval by the Landscape Architect, these records shall be delivered to the Agency, in
reproducible form, and in good and acceptable condition prior to final acceptance of the Work.
The Contractor shall provide two (2) reduced (original 11” x 17”) charts for each controller.
One copy shall be placed on the inside of the controller enclosure door. The second copy shall
be provided to Agency maintenance personnel. Record Drawings shall be approved by the
Landscape Architect prior to preparing the charts.
Each controller chart shall show the as-built condition of the area controlled by the automatic
controller. All symbols shall be readable at the final reduced size. The controller chart shall
include:
1. Connections to existing water lines.
2. Routing of pressure lines.
3. Routing of control valves.
4. Locations of remote control valves, gate valves, and quick coupling valves.
5. Other items as directed by the Agency.
The chart shall be a black line or blue line print and shall be colored or otherwise coded to
indicate the area of coverage for each station.
When completed and approved, the chart shall be hermetically sealed between two (2)
pieces of 10 mil plastic, minimum.
Each chart shall be completed and approved prior to final inspection of the irrigation system.



This Section: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Sections
: 1 2 3 4 5 6 7 8 9

Remodeling a home can be costly and frustrating, especially in decor of kitchen cabinets, veneer, bathrooms, vinyl siding, arts / crafts, patio enclosures, replacement windows doors, furniture, swimming pools spa, home security, or other architecture areas. Free Add Site 1, 2, 3, 4, 5, 6, 7
 

ADT Home Security - Replacement Windows - Home Improvement Ideas - Vinyl Siding Prices - Shopping - Bat Pest Control
Swimming Pools / Spa - Kitchen Cabinet Remodeling - Patio Enclosures - Site Map - Add URL Real Estate

Copyright © 2004 - 2008 Swimming Pools by Site-Found

Art / Decor Business / Companies Computers / Accessories Education / Schools Entertainment / Books Health / Environment Home and Garden Home Improvement / Decorating Home Sales / Real Estate Life / Homes Literature / Classics Miscellaneous Recreation / Sports Science / Technology Shopping / Gifts Society / Family Websites / Logos Favorites Add URL 2 3 4 5 6