Section 20 - Landscaping
07/24/01
20.8
As part of the plant establishment work, five (5) Working Days prior to completion of the
plant establishment period instructions shall be given to designated Agency maintenance
personnel by a qualified person from the Contractor's personnel on the use and adjustment of
the irrigation controllers installed.
During the plant establishment period, trees, shrubs, vines, and ground cover plants,
planted as part of the Contract, shall be pruned by the Contractor at the Contractor’s expense,
as directed by the Agency.
Trees and shrubs shall be watered, cultivated, and sprayed as required to assure a
vigorous, thriving condition from day of planting to end of plant establishment period. Weeds
shall be removed during this period. During the plant establishment period, the Contractor shall
not water between the hours of 7:00 a.m. and 7:00 p.m.
Should the Contractor fail, be neglectful, or negligent in this work, the Agency may elect to
perform plant establishment work. The Agency will charge the Contractor the cost for
performing the required work by deducting this cost from the payments due the Contractor.
Turf shall be watered, reseeded, edged, weeded, and mowed as required to assure a neat
appearance and a healthy and vigorous growth from the day of seeding to the end of plant
establishment period. The first mowing shall not be done until the grass is generally at least two
inches (2”) but less than three inches (3”) high. For the first mowing and all subsequent
mowing, the mower shall be set to cut at a height of one and one-half inches (1-1/2”).
Subsequent mowings, as required, shall be done before the grass is three inches (3”) high.
Grass clippings for all mowings shall not be allowed to lie after mowing. A catcher shall be used
on the mower, and grass clippings shall be removed and discarded off site. Immediately
following the first mowing of the turf, turf areas shall be fertilized at the rate of eight (8) lbs. per
one thousand (1,000) square feet or as otherwise specified in the Special Provisions.
Reapplication of fertilizer shall take place as directed by the Agency during the plant
establishment period.
Just prior to the end of the plant establishment period, the Contractor shall cut all grass,
weed all planting areas, and leave the work area in a neat and attractive condition. Prior to final
inspection, all trash and debris shall be removed and disposed of off site.
At the end of the plant establishment period, all plant material shall be in a healthy, growing
condition.
The Contractor shall guarantee a weed free, even stand of the lawn grass, with ninety-five
percent (95%) coverage, of the varieties specified. If such stand does not develop as a result of
the first seeding, the Contractor shall reseed and care for thin spots until an even stand with
ninety-five percent (95%) coverage is produced.
Weed control herbicides, in addition to that which is specifically required elsewhere, may be
applied to planted areas at no expense to the Agency, if the Contractor deems it necessary.
The type of herbicide to be used and method of application shall be approved by the Agency.
Following the plant establishment period, the Contractor shall provide a warranty that
guarantees all trees for one (1) year from date of Final Acceptance. The Contractor shall
replace any tree that dies during the warranty period and the replacement shall be the same
size container as originally designated on the Plans.
20-4.08 Inspection for Plant Establishment Work
Upon completion of the planting work and irrigation installation, the Contractor shall notify
the Agency that the project is ready for maintenance. The Agency will then schedule a pre-
maintenance walk-through inspection and will notify the Contractor and the Landscape Architect
of the time and date. Upon inspection, if the Agency and the Landscape Architect find the
irrigation, turf, and planting work complete and in compliance with the Contract, the Agency will
authorize the start of the plant establishment period. Written notice will be given to the
Contractor by the Agency as to the starting date of the plant establishment period.



This Section: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Sections
: 1 2 3 4 5 6 7 8 9

Remodeling a home can be costly and frustrating, especially in decor of kitchen cabinets, veneer, bathrooms, vinyl siding, arts / crafts, patio enclosures, replacement windows doors, furniture, swimming pools spa, home security, or other architecture areas. Free Add Site 1, 2, 3, 4, 5, 6, 7
 

ADT Home Security - Replacement Windows - Home Improvement Ideas - Vinyl Siding Prices - Shopping - Bat Pest Control
Swimming Pools / Spa - Kitchen Cabinet Remodeling - Patio Enclosures - Site Map - Add URL Real Estate

Copyright © 2004 - 2008 Replacement Windows by Site-Found

Art / Decor Business / Companies Computers / Accessories Education / Schools Entertainment / Books Health / Environment Home and Garden Home Improvement / Decorating Home Sales / Real Estate Life / Homes Literature / Classics Miscellaneous Recreation / Sports Science / Technology Shopping / Gifts Society / Family Websites / Logos Favorites Add URL 2 3 4 5 6