Section 9 – Changes and Claims
12/1/03
9.5
starting force account work. The Contractor shall submit Daily Work Reports (DWR’s) for
signature not later than 9:00 a.m. the day following performance of any force account work.
DWR’s shall list names of all Contractor’s staff, the staff person’s craft or trade, all craft or trade
labor hours, and all material and construction equipment used. The Contractor shall use the
Agency’s DWR’s in preparing billings for force account work.
9-8.03.A Labor
The Contractor will be paid the cost of direct labor (foreperson and below) used in the actual
and direct performance of the changed work including working foreman when authorized by the
Agency. Except as otherwise provided, the Contractor will receive no additional compensation
for overtime work without prior written authorization from the Agency. The cost of labor will be
the sum of the following:
9-8.03.A.(1) Actual Wages
Charges for labor will be the Contractor’s actual payroll costs for labor of any classification,
including employer payments to or on behalf of the workers for health and welfare, pension,
vacation, and similar purposes.
9-8.03.A.(2) Labor Surcharge
A twenty-six percent (26%) surcharge for taxes, insurance, and all other payments made to
or on the behalf of the employee shall be added to the actual wages.
9-8.03.A.(3) Subsistence and Travel
The Agency will pay the Contractor for actual subsistence and travel allowance costs
associated with the changed work required by labor agreements or acceptable to the Agency.
Documentation must be provided to the Agency.
9-8.03.B Materials
Payment will be for the purchaser’s actual cost of supplier or vendor furnished materials. If
the Contractor does not furnish satisfactory evidence of the cost of such materials, the cost will
be the lowest current wholesale price at which such quantities of materials are available and
delivered to the job site. The Agency reserves the right to purchase materials for the changed
work; the Contractor shall have no claims for costs or profit on such materials.
9-8.03.C Equipment
The prices paid for equipment directly and solely required for performance of the changed
work will be those listed in the current edition of the Caltrans publication, “Labor Surcharge and
Equipment Rental Rates”. If the equipment is not shown in this publication, the Contractor shall
be paid such hourly rental rates as are agreed upon by the Contractor and the Agency prior to
use of the equipment, plus thirty-three and one-third percent (33-1/3%) for the cost of fuel, oil,
lubrication, and field repairs and maintenance. In no case shall the hourly rental rates exceed
those of established distributors or equipment rental agencies serving the area.
The rate paid for the use of equipment constitutes full compensation to the Contractor for all
costs, including fuel, power, oil, lubrication, supplies, small tools, small equipment, necessary
attachments, repairs and maintenance of any kind, depreciation, storage, insurance, labor
(except for equipment operators) and any and all costs to the Contractor incidental to the use of
such equipment for the changed work.
Payment will not be made for the equipment while it is inoperative due to breakdowns or for
time in which no changed work was performed. Payment for rentals will include time required to
move equipment to the changed work from the nearest available rental source and to return it to
the source. However, no moving, loading, or transportation costs will be paid if the equipment is
used for any other portion of the Work.



This Section: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Sections
: 1 2 3 4 5 6 7 8 9

Remodeling a home can be costly and frustrating, especially in decor of kitchen cabinets, veneer, bathrooms, vinyl siding, arts / crafts, patio enclosures, replacement windows doors, furniture, swimming pools spa, home security, or other architecture areas. Free Add Site 1, 2, 3, 4, 5, 6, 7
 

ADT Home Security - Replacement Windows - Home Improvement Ideas - Vinyl Siding Prices - Shopping - Bat Pest Control
Swimming Pools / Spa - Kitchen Cabinet Remodeling - Patio Enclosures - Site Map - Add URL Real Estate

Copyright © 2004 - 2008 Replacement Windows by Site-Found

Art / Decor Business / Companies Computers / Accessories Education / Schools Entertainment / Books Health / Environment Home and Garden Home Improvement / Decorating Home Sales / Real Estate Life / Homes Literature / Classics Miscellaneous Recreation / Sports Science / Technology Shopping / Gifts Society / Family Websites / Logos Favorites Add URL 2 3 4 5 6